Bronx Kitchen Remodeling Costs
PUREWAL CONTRACTORS INC • May 22, 2025
Offering valuable insights into the construction industry, featuring expert tips, project showcases, and the latest trends. Providing practical advice for homeowners and builders alike, helping you make informed decisions about renovations and new builds
Kitchen Remodel Cost in the Bronx: What Homeowners Should Know in 2025

Your Guide to Pricing, Materials, Labor & Timeline for One- and Two-Family Homes
If you own a one- or two-family home in the Bronx and are thinking about remodeling your kitchen, you’re likely wondering: How much is this really going to cost? The kitchen is the heart of your home, and a remodel can dramatically improve your space—but smart planning starts with understanding the real numbers.
Let’s break it down: what to expect when it comes to costs, materials, labor, and how long the job will take.
💰 What’s the Average Cost of a Kitchen Remodel in the Bronx?
- Kitchen remodel costs in NYC tend to be higher than the national average, and the Bronx is no exception. For a full kitchen renovation in a private one- or two-family home, here's a ballpark:
- These estimates include both materials and labor, and they assume you’re doing a full renovation (cabinets, countertops, flooring, electrical, plumbing, etc.).
- Basic$; 25,000 – $35,000
- Mid-Range: $35,000 – $55,000
- High-End: $60,000 – $100,000+
🧱 What’s Included in the Price?
- Materials:
- Here’s a rough guide to common material costs:
- Cabinets: $6,000 – $25,000
- Countertops (Quartz, Granite, etc.): $3,000 – $10,000
- Flooring (Tile, Hardwood, Vinyl): $2,000 – $6,000
- Appliances: $3,500 – $15,000
- Lighting & Electrical Fixtures: $1,000 – $4,000
- Sinks, Faucets, Plumbing Fixtures: $800 – $3,000
- Backsplash & Paint: $1,000 – $3,000
- Labor:
- In NYC, skilled trades (electricians, plumbers, tile installers) are in high demand—and labor accounts for 35–50% of your total budget. Labor includes:
- Demolition and debris removal
- Framing and drywall
- Electrical and plumbing (with licensed contractors)
- Cabinet, countertop, and flooring installation
- Finish work (trim, paint, lighting, etc.)
Timeline:
- From planning to final walkthrough, most Bronx kitchen remodels take about 3-4 weeks(excluding planning and design) once construction begins. Here's a general timeline:
- Planning, Design: 2 weeks
- Demolition: 1-2 Days
- Plumbing & Electrical Rough-In: 2-3 Days
- Framing & Sheetrock -3-5 Days
- Install Cabinets, Flooring, Countertops: 2
- Finishing Touches: 1 week
Whether you're looking for a sleek modern look or a classic, family-friendly space, a kitchen remodel is an investment that pays off in both comfort and value.
If you're ready to start planning your Bronx kitchen renovation, we’re here to help. At Purewal Contractors Inc, we offer full-service kitchen remodeling—from design to final inspection—so you can enjoy a stress-free experience.
📞
Call us today (718)-441-5258 to schedule your free in-home consultation.
🛠️
Proudly serving all Bronx neighborhoods and surrounding areas.